The new temporary bailey bridge at Coolshannagh has opened today (15/5/2019) and will be in place for the next 12 months in order to facilitate the replacement of the Blackwater Bridge. A 30km speed limit is in operation over the bridge which allows two way traffic movement while works are ongoing.